AGRON
Marina viewed from the dock during assessment

Maritime Service

Assessment & Planning

The site first. The system after.

A written picture of the yacht, the marina or the facility — before equipment is chosen.

  1. 01

    Site

    What is being protected, and by whom. The yacht, the marina, the port or the island.

  2. 02

    Environment

    Water, air, shore and the usual traffic.

  3. 03

    Exposure

    What can actually reach the site.

  4. 04

    Systems

    What is already installed and what it does.

  5. 05

    Gaps

    Where the picture is missing. What the people on site should do.

  6. 06

    Plan

    What to add, integrate or leave. Order of work, not a shopping list. A return to the site after the first installation.

Name, organization, asset type, location, and how to reach you.